IPC/WHMA-A-620 cable and harness manufacturing

IPC/WHMA-A-620 Cable & Harness Manufacturing Capability

Define the revision, acceptance Class and inspection plan before releasing a cable or harness drawing.

IPC 620 is a common shorthand for IPC/WHMA-A-620, a cable and wire harness assembly workmanship and acceptance standard. It covers assembly practices such as crimped and soldered terminations. Specify the standard revision and product Class in the project file. The published scope does not set in-process or end-product inspection frequency; agree sampling separately. For an EDPcable RFQ, send the drawing, BOM and acceptance requirements so process scope and evidence can be reviewed before commitment.

IPC/WHMA-A-620 cable and harness inspection workstation with harness sample, microscope, ESD wrist strap, and inspection record folder
Quality & Compliance
SEC · 01Capability scope

Capability scope

Use this capability when a drawing or quality agreement calls for IPC/WHMA-A-620. The standard provides the workmanship basis; the project still needs an approved pin map, component requirements and inspection plan. A Class designation alone does not establish an inspection percentage or qualify a complete device.

01

Name the IPC/WHMA-A-620 revision, Class and applicable customer requirements

02

Define visual acceptance, electrical tests and sampling as separate checks

03

Match requested training or qualification evidence to the person, site and process scope

04

Agree first-article records, lot traceability and the handling of deviations before sampling

SEC · 02Process Flow

Process Flow

StepStation / ActionControl PointOutput Record
Input reviewStandard revision / Class / drawing / BOM / inspection planResolve requirements and confirm process scopeEngineering review record
Training confirmationOperator training status / training recordsTrained operators matched to the ClassTraining record confirmation
Sample buildJoining to the Class workmanship standard + internal inspectionSample Class consistencySample inspection record
Customer sample confirmationCustomer acceptance / Class deviation discussionBoth sides confirm the release boundarySample confirmation record
Production executionTrained operators join to the Class workmanship standardProcess Class stabilityProcess record
In-process inspectionInspect joints using the agreed quality-plan samplingIdentify departures from applicable acceptance requirementsInspection record with actual sampling extent
Release confirmationBatch sample + IPC re-review + COCClass + records completeCOC + IPC inspection report
SEC · 03Inspection Checkpoints

Inspection Checkpoints

Plan workmanship inspection and electrical verification separately. IPC/WHMA-A-620F, 1.1 Scope, states that inspection frequency is not specified. The following checklist is an RFQ planning aid; drawing-specific limits and the agreed quality plan control acceptance.

CheckpointWhat to defineEvidence to requestRelease boundary
Document controlStandard revision, Class, drawing and BOM revisionApproved document list and resolved requirement conflictsConfirm requirements before selecting an inspection plan
Materials and toolingContact/wire combination, component instructions and applicable toolingMaterial identifiers and applicable setup recordsClass alone does not prove component or tooling compatibility
Termination workmanshipCrimp, solder, IDC and shield checks applicable to the designInspection results tied to the relevant acceptance criteriaRecord actual inspection extent and agreed sampling
Electrical verificationPin map, continuity/shorts and other agreed testsTest method, limits, result and assembly or lot identifierElectrical checks complement visual acceptance
Mechanical checksDimensions, retention, routing and strain relief as applicableDrawing-referenced measurements or agreed test resultsDo not substitute a generic force or bend limit for the design
Final releaseLot identity, deviations, first-article status and required recordsRelease record and agreed COC with supporting inspection dataResolve nonconformances against the approved quality plan
SEC · 04Deliverable Records

Deliverable Records

Request evidence for the exact assembly and lot. A supplier COC is a conformity declaration; it does not replace inspection data or establish independent site qualification. Personnel training and QML process qualification should be checked against their actual scope.

Deliverable RecordStageUseLimit
Workmanship inspection recordIn-process / finalResults against the agreed revision and ClassState actual coverage; sampling follows the quality plan
FAI (first article inspection)First article / pilotAlign first-article joint quality with the ClassNeeds a customer-confirmed Class standard
COCProductionBatch release statementNot equivalent to third-party certification
Training / qualification evidenceRFQ / auditVerify requested personnel or site/process credentialsConfirm scope, validity and disclosure terms; COC is separate
Batch labelProductionTrace to a specific batch + ClassLabel format as agreed with the customer
SEC · 05Applicable Projects

Applicable Projects

IPC/WHMA-A-620 can provide the workmanship basis for these cable families when specified in the project documents. Class, test coverage and device-level requirements are confirmed for each project:

01

Display interconnects: agree termination criteria and the panel-specific pin map

02

Medical-device harnesses: review workmanship requirements separately from device safety and regulatory evidence

03

Micro-coax assemblies: define termination inspection and any required signal measurements

04

IDC ribbon assemblies: confirm conductor/contact compatibility and termination inspection

SEC · 06Related Applications

Related Applications

IPC/WHMA-A-620 joining workmanship applies to display interconnect, medical device, FFC/FPC, IDC, LVDS, and micro-coax harness projects, and is often used together with 100% electrical testing, engineering review and drawing control, ISO 9001, and ISO 13485 medical manufacturing. When laser stripping, FPC-to-wire, or cleanroom medical harnesses are involved, the joining standard and the matching process requirements should be confirmed together.

SEC · 07Why EDPcable

Why EDPcable

WHY · 01

IPC assembly requirements can be handled for display interconnect, medical device, FFC/FPC, IDC, LVDS, and micro-coax cable projects

WHY · 02

Class requirements are reviewed before sampling so process setup and inspection records follow the same project basis

WHY · 03

Certificate copies and training evidence can support customer audits under the agreed disclosure path

WHY · 04

One-business-day first response, with the project team handling day-to-day quality-file coordination

SEC · 08FAQ

FAQ

01
What is IPC 620 for cable assemblies?
IPC 620 usually refers to IPC/WHMA-A-620. It addresses cable and wire harness manufacturing practices and acceptance, including crimped and soldered connections. Use the full standard identifier, revision and required Class in an RFQ. The primary scope reference is listed below.
02
Does Class 3 mean every cable must be inspected?
The Class specifies applicable acceptance requirements. IPC/WHMA-A-620 does not set in-process or end-product inspection frequency in its scope. Define sampling or 100% inspection, lot size and response to failures in the agreed quality plan.
03
Does an IPC training certificate certify the factory or cable?
Check the exact credential and its scope. Personnel training, site/process qualification through QML, and a supplier Certificate of Conformity (COC) are different records. Request current project-relevant evidence rather than treating them as interchangeable.
04
Does workmanship inspection replace electrical testing?
Visual inspection and an electrical test answer different questions. Agree pin-map continuity and shorts checks separately; define insulation resistance or dielectric testing only where the drawing and components support the method and limits. A continuity pass alone does not establish high-speed signal performance.
05
How should we specify Class 2 or Class 3?
The customer defines the required Class and standard revision in the controlling documents, with applicable product requirements. Do not assign a Class from an industry label alone. Confirm the supplier process scope and resolve conflicting requirements before building samples.
06
What documents should accompany an IPC 620 RFQ?
Provide the controlled drawing and BOM, revision and Class, termination details, inspection and test plan, first-article requirements, record format and lot identification. State any credential or site qualification requirement explicitly so its evidence can be reviewed.
SEC · 09RFQ Inputs

RFQ Inputs

Specify the acceptance basis and evidence needed for your cable assembly. The references below support the standard scope and credential distinctions; they do not establish EDPcable qualification or acceptance of a particular assembly. Content reviewed 9 October 2026.

Primary referenceSourceWhat this reference supports
IPC/WHMA-A-620F, 1.1 Scope (October 2025)https://www.electronics.org/TOC/IPC-WHMA-A-620F-TOC.pdfStandard scope and the need to agree inspection frequency separately
IPC Validation Services: A-620 QMLhttps://www.electronics.org/validation-services-qualified-manufacturing-companies-qml-ipcwhma-620Site/process qualification is a distinct evidence route
IPC Wire Harness Assembly FAQshttps://www.electronics.org/wire-harness-assembly-faqsOperator training and standards-based personnel certification have different purposes
01

Controlled drawing and BOM, including pin map, wire/contact details and revision

02

IPC/WHMA-A-620 revision, required Class, addenda and customer requirements

03

Termination methods, component assembly instructions and process constraints

04

Separate workmanship inspection and electrical/mechanical test plans, including sampling, limits and failure handling

05

First-article and batch record formats, lot identification and agreed COC requirements

06

Any personnel credential or site/process qualification required, with evidence scope and disclosure arrangements

Send the IPC Class, drawing, and quality-file requirements before sampling

Confirming the Class, joining method, inspection scope, and record format early keeps samples, production, and audit documents on the same basis.