Company Dossier · ABOUT

About Us

About EDPcable

EDPcable is a Dongguan-based custom cable assembly and wire harness manufacturer founded in 2012. We work directly with equipment makers and project teams to turn drawings, BOMs, mating parts, samples, and installation constraints into controlled builds.

FACT · 01 · Established
2012
FACT · 02 · Location
Dongguan, Guangdong, China
FACT · 03 · Manufacturing Focus
Custom cable assemblies and wire harnesses
FACT · 04 · Build Basis
Drawings, BOMs, mating parts, and samples
About Us
Dongguan · Established 2012
SEC · 01Manufacturing Basis

How We Define a Build

Every project starts with customer-controlled inputs: a drawing or sample, exact mating parts, pin map, installed route, quantity, project stage, and acceptance needs. We resolve undefined fields before quoting or releasing a sample build.

Once requirements are agreed, the released build definition controls materials, wire or cable construction, dimensions, pin mapping, shielding and grounding, markings, and test scope. Samples and approved changes gate repeat production.

How We Define a Build
SEC · 02Operating Model

From Project Inputs to a Controlled Build

Each stage has a defined input and release point, so quoting, sampling, and repeat production stay tied to the same project definition.

STEP · 01

Requirement Capture

Drawings or samples, exact mating parts, pin map, installed route, quantity, project stage, and acceptance needs are captured before release.

STEP · 02

Engineering Release

Materials, wire or cable construction, dimensions, pin mapping, shield and ground termination, markings, and test scope are resolved into one build definition.

STEP · 03

Sample Qualification

First articles are built and checked against the agreed plan. Approval and documented changes gate the move into repeat production.

STEP · 04

Repeat Production Control

Released revisions, inspection points, electrical checks, and agreed batch records remain tied to the order and its approved build definition.

SEC · 03By The Numbers
KPI · 0115+Team ExperienceCable-assembly experience represented by the team; separate from the 2012 company founding date.
KPI · 0250+Shipment DestinationsCumulative countries and regions reached by completed shipments.
KPI · 03500+Recorded Build ModelsDistinct cable-assembly configurations recorded across sample and production work.
KPI · 0498%Reported SatisfactionInternal customer-feedback measure; project outcomes remain program-specific.
SEC · 04Core Values

How We Control Custom Builds

VAL · 01

Drawing-Based Quality

Inspection points, acceptance criteria, sampling, and records follow the released drawing and project control plan.

VAL · 02

Revision Control

Connector selections, pin maps, dimensions, materials, markings, and test requirements remain tied to the released build definition.

VAL · 03

Clear Project Ownership

Questions, deviations, and changes are documented and resolved with a defined contact before the next build stage.

VAL · 04

Qualification Before Production

Samples and first articles are checked against agreed requirements before repeat production is released.

SEC · 05Certifications

Certifications & Credentials

Credentials are shown as recorded. Applicability depends on the named legal entity, certified site, current scope, and validity; product- or project-specific compliance requires the applicable documents.

CERT · 01

ISO 9001:2015

Quality Management System Certification

Management-system credential; product requirements remain project-specific.

Issuing Body: TÜV SÜD · 2018

CERT · 02

ISO 14001

Environmental Management System Certification

Environmental management-system credential; product declarations remain material- and project-specific.

Issuing Body: TÜV SÜD · 2019

CERT · 03

UL 50 / 508

Enclosure & Industrial Control Equipment Safety

Applicable only to the listed or recognized scope and covered equipment; not a blanket cable approval.

Issuing Body: UL LLC · 2021

CERT · 04

ISO 13485

Medical Device Quality Management System

Quality-management-system credential; not a product approval.

Issuing Body: TÜV SÜD · 2020

SEC · TMCustomer Feedback

Customer Voice

Testimonials

Real project feedback from engineering, sourcing and quality teams

FEEDBACK · 01
Product quality is very stable, delivery is on time, and each batch comes with a complete test report. Excellent cooperation experience.

Zhang Wei·Procurement Manager·Bosch China

Zhang Wei
01 / 04